High-Performance Solar Carport System for EV Charging

Still deciding? Get samples of $ !
Order Sample

Product Description

Basic Specifications
Model NO.
Solar Carport For EV Charging
Certification
GB, ISO, CE, RoHS
Application
Commercial
Material
Steel
Type
Solar Carport
Foundation
Anchor Bolt+Concrete Base
Wind Load
Less Than 60m/S
Row
Single/Double
Production Capacity
100000 Tons / Year
Package Size
25.00cm * 20.00cm * 27.00cm
Product Overview
Solar Carport System

Designed for electric vehicle charging scenarios, this high-performance solar carport system combines photovoltaic power generation, vehicle shading and energy management to create a green and efficient parking solution. Adopting high-efficiency monocrystalline silicon solar panels and modular aluminum and steel structure, the average daily power generation can cover the charging demand of 1-3 electric vehicles. It supports grid-connected or off-grid operation and is suitable for commercial, residential and public parking lots.

Solar Carport Banner
Carport Detail 1
Carport Detail 2
Categories Parameter details
Photovoltaic module Solar carport for parking lot, combining aesthetics and functionality.
Structural design 6063-T6 aluminum alloy frame, wind resistance class 12 (60m/s), snow load 1.5 kN/m²
Charging compatibility Support AC/DC charging pile, output voltage 220V-480V, suitable for mainstream electric vehicle brands
Customization Options Size (single span 3-12 m), color scheme (12 RAL standard colors), roof inclination (10°-30°)
System life 25-year performance warranty, annual attenuation rate ≤ 0.5%
Key Advantages
1
Efficient power generation and energy self-sufficiency

Average daily power generation is 1.5-2.8 kWh/m², which can be used to supply power to the charging pile directly or stored in the battery system. Double-glass anti-glare panel reduces light pollution, light transmission rate ≤5%.

2
All-weather vehicle protection

The roof structure shields the vehicle from ultraviolet rays, hail, rain and snow, reducing paint aging. The pre-buried design of columns ensures the ground is level.

3
Low carbon investment return

Through power generation and government subsidies, the payback period is about 5-7 years. Helps enterprises achieve ESG goals by reducing carbon emissions by 80-120 tons/100 square meters.

Installation 1
Installation 2
Installation 3
Installation 4
Installation 5
Installation 6
Technical Information & Quality
Technical Drawing Specifications Structure Profile Advantages List System Comparison
Packaging & Shipping
Packaging Process
Frequently Asked Questions
How long does it take to start generating power after installation?
The system is ready for operation within 24 hours after installation. The grid-connected version is subject to grid approval (usually 1-2 weeks).
Can I charge properly on rainy days?
Yes! The system can be equipped with lithium battery storage unit (optional) to store surplus power on sunny days to ensure uninterrupted power supply during rainy days/nights.
Does it require frequent maintenance?
Only quarterly cleaning of panel surface dust (self-cleaning coating reduces maintenance frequency by 60%) and a check of cable connections and bracket stability once a year.
Can it be expanded to a multi-car charging station?
Yes! The modular design supports horizontal cascading, and a single system can cover up to 20+ parking spaces, which is suitable for parking lot expansion.
How to evaluate the feasibility of the project?
We provide Free Light Analysis (calculate potential based on geographic data) and ROI Simulation Reports (comprehensive electricity price and subsidy forecasts).
What materials are used for the main structure?
The system utilizes high-strength 6063-T6 aluminum alloy and steel structures, ensuring durability and resistance to extreme wind and snow loads.

Related Products